Skip to main content
Ready-Made Proposals

Pick your payback. See the machine.

Choose how fast you want the machine to pay for itself, and we'll show the pallet volume that gets you there on each model — with the full cost breakdown. Change any number to match your floor exactly. Hover any for an explanation.
Type a daily pallet count and we'll pick the machine and payback that fit best.
1How fast should it pay for itself?
2Which machine? Each needs a different volume to hit that payback.
3Your proposal — edit anything on the left to match the customer's floor

Your numbers

Worker cost works out to 96.15/hour (₹20,000 ÷ 26 days ÷ 8 hrs)

ErgoPack 700

Hand-crank, no battery, no power needed — the lowest-cost entry into automated strapping.

Investment
₹10.00 L
Pallets / day
300
Shifts
3 × 100/shift
Crew today
12 people
4 per shift
With ErgoPack
3 people
1 per shift

Where the money goes every month

What one worker costs you
₹20,000a month ÷26 days=769a day ÷8 hrs=96.15/hour
What you pay today
4 people × 3 shifts = 12 people, each on a full ₹20,000 salary
12 × ₹20,000 = ₹2,40,000
₹2,40,000
What you'd pay with ErgoPack
3 operators, each running the machine only 2.50 hrs a shift — you pay for those hours, not a full salary
3 × 2.50 hrs × ₹96.15 × 26 days = ₹18,750
₹18,750
Strapping material saved
₹12 of strap saved on every pallet, thanks to calibrated repeatable tension
300 pallets × ₹12 × 26 days = ₹93,600
₹93,600
Extra you spend on labour without ErgoPack
₹2,40,000₹18,750
₹2,21,250
Total monthly saving
₹2,21,250 labour + ₹93,600 material
₹3,14,850
Payback: ₹10,00,000 ÷ ₹3,14,850 a month = 3.2 months

The time you get back

Strapping work today
7.5 hrs
man-hours a shift, shared across 4 people
100 pallets × 4.5 min ÷ 60
With ErgoPack
2.5 hrs
one operator, same output
100 pallets × 1.5 min ÷ 60
Operator freed for
5.5 hrs
every shift · 429 hrs a month
8 hr shift − 2.5 hrs worked

Beyond payback

Payback
3.2 months
Year 1 saving
₹37.78 L
5-year net
₹1.75 Cr
10-year net
₹3.59 Cr

Net figures are after the machine cost and ₹1.00 L/year AMC from year 2 onward.

How these numbers are calculated
  • • Manual crews default to 2 people per 50 pallets per shift — real-world staffing that already allows for handling, waiting and rest, not raw strapping speed. You can override it with your actual headcount.
  • • Your current cost counts full salaries, because a worker is paid their full wage whether or not they are strapping all day. The ErgoPack cost counts only the hours the operator actually runs the machine.
  • • Freed hours are capacity you already pay for. Their value is already inside the labour saving, so they are shown as time — never added to the rupee total twice.
  • • Payback is the machine price divided by the total monthly saving. AMC applies from year 2; year 1 is under warranty.
  • • If the volume exceeds what one machine can strap in a shift, the figures automatically account for additional machines.