ROI Calculator
Calculate your savings instantly
Your Current Setup
Production Lines
Workers/Line/Shift
Shifts/Day
Monthly CTC (₹)
Pallets/Shift/Line
Mins/Pallet (Manual)
Payback
13.7 mo
Annual Savings
₹25,92,000
5-Year Benefit
₹96,10,000
After AMC from Yr 2
10-Year Benefit
₹2,20,70,000
Includes ₹1L/yr AMC
Manpower
Current Staff8
With ErgoPack2
Staff Freed
6 people
Time Efficiency
Current Time4.5
ErgoPack Time1.5
Hours Saved
5.0 hrs/daySAVED
Monthly Labor Cost
Current Cost₹2.40 L
ErgoPack Cost₹60.0K
Monthly Savings₹1.80 L
Annual Savings₹21.60 L
Payback Analysis
Payback Period13.7 months
AMC (From Yr 2)₹1.00 L
Net Annual (After AMC)₹24.92 L
Strapping Waste Savings
Daily
₹1.2K
Monthly
₹36.0K
Annual
₹4.32 L